Project GDC is getting closer to finish.
Project GDC is getting closer to finish.
The custom designed balcony at Gemma Della Collina.
An exterior shot at Project Gemma Della Collina right before thanksgiving.
A little concrete work before the paver driveway begins at project GDC
A look at the structural trusses in project GDC
Shutters custom made for project GDC
Here’s a look at the groin vault in the front entry at project Gemma Della Collina.
The triple groin vault entry at Gemma Della Collina is ready for color and columns.
The stair tower at Gemma Della Collina on a gloomy day. The photo shows off the timber truss tails and the aged glaze we added to the stucco for an old world appearance. The stone and plank shutters will finish off the look.
For the 3 fireplaces, we will feature a different look on each. This master bedroom hearth and mantel shows off travertine ledgestone and a stained box beam mantel.
The Great Room at Project Gemma Della Collina is plastered and ready for finish work.
The freshly plastered stair tower.
Groin vault framed and ready for the lime plaster at Gemma Della Collina.
The start of the groin vault at our Tuscan project.
Salvaged barn timbers are obtained for ceiling details and rustic mantels at Gemma Della Collina.